25-09-2025 |
Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the tariff relating to Gas w.e.f. 1st July 2025 for Central Power Generation Company Limited (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | |
02-09-2025 | Notification S.R.O 1713(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated August 08, 2025 along with revised tariff components attached as Annex-I in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for July - September 2025 quarter on account of US CPI, N-CPI and Exchange rate variation | |
15-08-2025 | Notification S.R.O 1558(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated July 02, 2025 in the matter of Second Tariff Modification Petition filed by Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu | |
08-08-2025 | Notification S.R.O 1489(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated June 26, 2025 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Advance Income Tax paid to the Federal Board of Revenue | |
08-08-2025 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of tariff for July-September 2025 Quarter for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | |
30-07-2025 |
Decision of the Authority in the matter of joint application filed by CPPA-G and Central Power Generation Company Limited for reduction in tariff Components of Guddu 747 | |
02-07-2025 |
Decision of the Authority in the mailer of Second Tariff Modification Petition filed by Central Power Generation Company Limited for its 747 MW CCPP Guddu | |
26-06-2025 |
Decision of the Authority in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-GUDDU) on account of Advance income Tax paid to the Federal Board of Revenue (FBR) | |
29-05-2025 | Notification S.R.O 980(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 07., 2025 along with revised tariff components attached as Annex-I in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for the quarter April - June 2025 on account of US CPI, N-CPI and Exchange rate variation | |
07-05-2025 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for April-June 2025 Quarter for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Proiect at Guddu | |
05-05-2025 | Notification S.R.O 789(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated March 17., 2025 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue for October - December 2024 quarter of the Tax Year 2025 | |
28-04-2025 | Notification S.R.O 790(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated March 11,2025 in the matter of Tariff Modification Petition filed by Central Power Generation Company Limited for inclusion of open cycle operations on Gas for its Block-I and Block-II | |
27-04-2025 | Notification S.R.O 512(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated February 12, 2025 along with revised tariff schedule attached as Annex-I regarding adjustment in Insurance Component of Capacity Charge Part of Tariff for the period of August 10,2023 to August 03,2024 in respect of Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu | |
17-03-2025 |
Decision of the Authority in the matter of Reimbursement request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue (FBK) | |
11-03-2025 |
Decision of the Authority in the matter of Tariff Modification Petition filed by Central Power Generation Company Limited for inclusion of Open Cycle Operations on gas for its Block-I and Block-lI | |
21-02-2025 | Notification S.R.O 211(I)/2025 - NEPRA hereby notifies the 'Decision of the Authority dated January 08, 2025 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue' | |
18-02-2025 | Notification S.R.O 197(I)/2025 - NEPRA hereby notifies the Decision ofthe Authority dated January 24, 2025 along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for the quarter January - March 2025 on account of US CPI, N-CPI and Exchange rate variation | |
12-02-2025 |
Decision of the Authority in the matter of Adjustment/Indexation in Insurance Component of Capacity Charge Part of tariff for the period of August 10, 2023 to August 03. 2024 for Central Power Generation Company Limited for its 747 MW combined cycle power project at Guddn | |
08-01-2025 |
Decision of the Authority in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-GUDDU) on account of Advance income Tax paid to the Federal Board of Revenue (FBR) |
06-11-2024 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for October-December 2024 Quarter for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu | |
18-10-2024 | Notification S.R.O 2033(I)/2024 - NEPRA hereby notifies the 'Decision of the Authority dated August 30, 2024 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue | |
18-10-2024 | Notification S.R.O 2032(I)/2024 - NEPRA hereby notifies the 'Decision of the Authority dated August 30, 2024 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue | |
17-10-2024 | Notification S.R.O 2035(I)/2024 - NEPRA hereby notifies the 'Decision of the Authority dated August 29, 2024 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue | |
01-10-2024 | Notification S.R.O 1625(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated August 16, 2024 in the matter of indexation/adjustment of foreign debt servicing components of tariff for the period ofJuly 1,2024 to December 31,2024 in respect of Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu | |
26-08-2024 | Notification S.R.O 1366(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated July 31, 2024 along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for the quarter July - September 2024 on account of US CPI, N-CPI and Exchange rate variations | |
30-08-2024 |
Decision of the Authority in the matter of Reimbursement request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Advance Income Tax paid to the Federal Board of Revenue (FBR) | |
30-08-2024 |
Decision of the Authority in the matter of Reimbursement request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu on account of Income Tax paid to the Federal Board of Revenue (FBR) | |
29-08-2024 |
Decision of the Authority in the matter of Reimbursement request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue (FER) | |
16-08-2024 |
Decision of the Authority in the matter of Indexation/Adjustment of Foreign Debt Servicing Components of tariff for the Period of July 01, 2024 to December 31, 2024 for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu | |
31-07-2024 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for July-September 2024 Quarter for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu F | |
29-05-2024 | Notification S.R.O 854(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated 07th May, 2024 along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for the quarter April - June 2024 on account of US CPI, N-CPI and Exchange rate variations | View |
07-05-2024 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for April-June 2024 Quarter for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | |
17-04-2024 | Notification S.R.O 607(I)/2024 - NEPRA hereby notifies the decision of the Authority dated 29th February, 2024 along with revised tariff components regarding adjustment in Insurance Component of Capacity Charge Part of Tariff on account of Actual Insurance Premium for the period February 11, 2023 to August 09, 2023 in respect of Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu | View |
17-04-2024 | Notification S.R.O 606(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated 29th February, 2024 along with revised tariff components in the matter of indexation/Adjustment of Foreign Debt Servicing Components of Tariff on account of Exchange Rate and LIBOR variation for the period January 1, 2024 to June 30, 2024 in respect of Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu | View |
13-03-2024 | Notification S.R.O 394(I)/2024 - NEPRA hereby notifies the decision of the Authority dated 01St February, 2024 in the matter of approval of interim tariff for open cycle operations on gas requested by Central Power Generation Company Limited for its Block-I and block-Il | View |
29-02-2024 |
Decision of the Authority in the matter of Indexation/Adjustment Foreign Debt Servicing Components of Tariff for the Period of January 01. 2024 to June 30. 2024 for Central Power Generation Company Limited (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | |
29-02-2024 |
Decision of the Authority in the matter of Adjustment/Indexation in Insurance Component of Capacity Charge Part of Tariff for the Period of February 11, 2023 to August 09, 2023 for Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu | |
15-02-2024 | Notification S.R.O 268(I)/2024 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. for 747 MW Combined Cycle Power Project at Guddu for January - March 2024 quarter on account of US CPI, N-CPI and Exchange rate variations | View |
01-02-2024 |
Decision of the Authority in the matter of Approval of Interim Tariff for Open Cycle Operations on Gas requested by Central Power Generation Company Limited for Its Block-I and Block-Il. (CPGCL) | |
25-01-2024 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for January-March 2024 Quarter for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu ( |
12-12-2023 | Notification S.R.O 1826(I)/2023 - NEPRA hereby notifies the Decision of the Authority in the matter of adjustment in the energy charge part of the tariff relating to Gas w.e.f. 9th February 2016 to 31st December 2022 for Central Power Generation Company Limited | View |
30-11-2023 | Notification S.R.O 1768(I)/2023 - NEPRA hereby notifies the Decision of the Authority in the matter of Adjustment in the Energy Charge Part of' the Tariff relating to Gas w.e.f 9th February 2016 to 30th June 2022 for Central Power Generation Company Limited (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
14-11-2023 | Notification S.R.O 1605(I)/2023 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. for 747 MW Combined Cycle Power Project at Guddu for October - December 2023 quarter on account of US, CPI, N-CPI and Exchange rate variations | View |
14-11-2023 | Notifiction S.R.O 1604(I)/2023 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. for 747 MW Combined Cycle Power Project at Guddu for October - December 2020 to July to September 2023 quarters on account of N-CPI variation | View |
13-11-2023 | Decision of the Authority in the matter of Indexation/Adjustment of Foreign Debt Servicing Components of Tariff for the Period of July 01, 2023 to December 31, 2023 for Central Power Generation Company Limited (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
30-10-2023 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 9th February 2016 to 31st December 2022 for Central Power Generation Company Ltd. (CPGCL) | View |
24-10-2023 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for October-December 2023 Quarter | View |
24-10-2023 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu from October-December 2020 to July-September 2023 Quarters | View |
19-10-2023 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f 9th February 2016 to 30th June 2022 for Central Power Generation Company Limited (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
31-08-2023 | NOTIFICATION S.R.O 1202(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. for 747 MW Combined Cycle Power Project at Guddu for the quarter July to September 2023 on account of US, CPI, CPI Local and Exchange rate variations | View |
09-08-2023 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for April to June 2023 Ouarter | View |
16-06-2023 | NOTIFICATION S.R.O 852(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff on account of US, CPI, CPI Local and Exchange rate variation for the period of April to June 2023 in respect of Central Power Generation Company | View |
16-06-2023 | Decision of the Authority in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Plant at Guddu on account of income Tax paid to the Federal Board of Revenue (FBR) | View |
16-06-2023 | Decision of the Authority in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Plant at Guddu on account of income Tax paid to the Federal Board of Revenue (FBR) | View |
12-05-2023 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f July to 3Vt December 2022 for Central Power Generation Company Ltd (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
12-05-2023 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for April to June 2023 Quarter | View |
12-05-2023 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st January 2023 for Central Power Generation Company Ltd. (CPGCL) | View |
14-04-2023 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1 January 2023 for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
04-04-2023 | NOTIFICATION S.R.O 431(I)/2023-NEPRA hereby notifies the following adjustments in the approved tariff of CPGCL Central Power Generation Company T.imited-747 MW CCPP Schedule of Fuel Cost Part of Energy Charge Adjustment on Account of Fuel Price Variation for Gas | View |
04-04-2023 | NOTIFICATION S.R.O 427(I)/2023-NEPRA hereby notifies the following adjustments in the approved tariff of CPGCL Central Power Generation Company Limited Schedule of Fuel Cost Part of Energy Charge Adjustment on Account of Fuel Price Variation for Gas | View |
04-04-2023 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st July to 31st December 2022 for Central Power Generation Company Ltd. (CPGCL) | View |
22-03-2023 | NOTIFICATION S.R.O 399(I)/2023- NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustrnent of tariff for the quarter January-March 2023 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd. | View |
15-03-2023 | Decision of the Authority in the matter of Indexation/Adjustment of Foreign Debt Servicing Component of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for the period of January 1,2023 to June 30, 2023 | View |
17-02-2023 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for January-March 2023 Quarter | View |
29-12-2022 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas we.f. Pt January to 30th June 2022 for Central Power Generation Company Ltd. (CPGCL) | View |
29-12-2022 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st January to 30th June 2022 for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
01-11-2022 | NOTIFICATION S.R.O. 1968(I)/2022 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff on account of Exchange Rate and LIBOR variation for the period 1st July 2022 to 31st December 2022 in respect of Central Power Generation Company Ltd. | View |
28-10-2022 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for October-December 2022 Quarter | View |
29-08-2022 | NOTIFICATION S.R.O. 1689(I)/2022-NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter January - March 2022 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd | View |
29-08-2022 | NOTIFICATION S.R.O. 1658(I)/2022-NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter April - June 2022 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd | View |
25-08-2022 | Decision of the Authority in the matter of Indexation/ Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
27-07-2022 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for July-September 2022 Quarter | View |
20-07-2022 | S.R.O. 1220(1)/2022- NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff on account of Exchange Rate and LIBOR variation for the period lstJuly 2021 to 31St December 2021 in respect of Central Power Generation Company Ltd | View |
20-07-2022 | S.R.O. 1213(1)/2022- NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff on account of Exchange Rate and LIBOR variation for the period Pt January 2022 to 30th June 2022 in respect of Central Power Generation Company Ltd. | View |
09-06-2022 | S.R.O. 1041(1)/2022- NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter October-December 2021 on account of US CPI, CPI Local and Exchange Rate variation and revised components for 28th December-31St December 2020, January - March 2021, April-June 2021 and July-September 2021 quarters in respect of Central Power Generation Company Ltd | View |
08-06-2022 | S.R.O. 934(1)/2022- NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter April-June 2021 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd. | View |
08-06-2022 | S.R.O.864(1)/2022-, NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter July-September 2021 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd. | View |
27-05-2022 | S.R.O.745(1)/2022-NEPRA hereby notifies the Decision of the Authority in the matter of Motion for Leave for Review filed by Central Power Generation Company Ltd. (CPGCL) against Determination of the Authority dated December 28, 2020 in the matter of Open Cycle Operations and Reduction in ROE of Guddu 747 MW Power Plant | View |
22-04-2022 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for April-June 2022 Quarter | View |
24-02-2022 | Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
21-01-2022 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
03-11-2021 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
26-08-2021 | Decision of the Authority In the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
02-08-2021 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
28-07-2021 | Decision of the Authority in the matter of Motion for Leave for Review filed by Central Power Generation Company Ltd. (CPGCL) against Determination of the Authority dated December 28, 2020 in the matter of Open Cycle Operations and Reduction in ROE of Guddu 747 MW Power Plant | View |
27-04-2021 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
01-03-2021 | Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
18-02-2021 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
12-01-2021 | Determination of the Authority in the matter of Tariff Modification Petition filed by Central Power Generation Company Ltd. (CPGCL) for Modification/Revision of Tariff Determination dated 24th February 2006 | View |
29-12-2020 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st September, 2020 for Central Power Generation Company Ltd. (CPGCL) | View |
28-12-2020 | Determination of the Authority in the matter of Tariff Modification Petition filed by Central Power Generation Company Ltd. (CPGCL) to include Open Cycle Tariff for the 747 MW Combined Cycle Power Project at Guddu in CPGCL's Notified Tariff | View |
11-12-2020 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
11-12-2020 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
16-10-2020 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
16-10-2020 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st August, 2020 for Central Power Generation Company Ltd. (CPGCL) | View |
01-10-2020 | Order of the authority in the matter of Review Petition filed by Central Power Generation Company Limited against the decision of the Authority dated July 10, 2019. | View |
03-09-2020 | Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
27-07-2020 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
07-07-2020 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2020 | View |
28-04-2020 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
14-02-2020 |
Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | |
11-02-2020 |
Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | |
16-01-2020 |
Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2020 |
01-11-2019 | Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
18-09-2019 | Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
29-08-2019 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) | View |
29-08-2019 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
20-08-2019 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
11-07-2019 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2019 | View |
30-05-2019 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
14-03-2019 | Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
07-02-2019 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) | View |
06-02-2019 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
23-01-2019 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
08-01-2019 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2019 | View |
03-01-2019 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) | View |
02-01-2019 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
23-10-2018 | Decision of the Authority in the matter of Reimbursement of Custom Duty and Taxes as Pass Through for Central Power Generation Company Ltd. (CPGCL) for its 747 MW Combined Cycle Power Plant | View |
19-10-2018 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
10-09-2018 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
10-09-2018 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) | View |
07-08-2018 | Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu | View |
29-06-2018 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2018 | View |
02-03-2018 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | View |
02-03-2018 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) | View |
07-02-2018 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2018 | View |
10-07-2017 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2017 | |
07-04-2017 | Decision of the Authority in the matter of Motion for Leave for Review filed by Central Power Generation Company Ltd. (CPGCL) against Authority's Tariff Determination dated April 26, 2016 for 747 MW Power Plant located at Guddu | |
25-01-2017 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | |
25-01-2017 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) |
29-12-2016 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2017 | |
09-11-2016 | Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu | |
10-08-2016 | Corrigendum - Determination of the Authority in the matter of Tariff Petition filed by Central Power Generation Company Ltd. (CPGCL) for Determination of Generation Tariff for 747 MW Combined Cycle Power Project at Guddu dated 26th April 2016 | |
15-07-2016 | Decision of the Authority relating to the Tariff Adjustment in Escalable Part of Capacity Purchase Price of Central Power Generation Company Ltd. on account of CPI Variation w.e.f. July 01, 2016 | |
25-05-2016 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. | |
26-04-2016 | Determination of the Authority in the matter of Tariff Petition filed by Central Power Generation Company Ltd. (CPGCL) for Determination of Generation Tariff for 747 MW Combined Cycle Power Project at Guddu | |
01-01-2016 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2016 | |
01-01-2016 | Decision of the Authority in the matter of Application for Interim Tariff filed by Central Power Generation Company Ltd. (CPGCL) regarding Approval/Determination of Generation Tariff for 747 MW Combined Cycle Power Plant at Gaddu |
02-10-2015 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) | View |
09-07-2015 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2015 | View |
04-02-2015 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2015 | View |
10-07-2014 | Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2014 | View |
01-01-2014 | Decision of the Authority in the Matter of Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2014 | View |
26-07-2013 |
Decision of the
Authority relating to the
Tariff Adjustment of Central Power Generation
Company Ltd. (CPGCL) for Variation in CPI w.e.f. July 1, 2013 (Case No.
NEPRA/TRF-44/CPGCL-2005) — Intimation of Decision of
Tariff pursuant to Section 31(4) of the Regulation
of Generation, Transmission and Distribution of Electric Power Act LXL of 1997) |
View |
04-04-2013 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (for Gas w.e.f. January 01, 2013) for CPGCL | View |
21-01-2013 | Decision of the Authority relating to the Tariff Adjustment for Variation in CPI w.e.f. January 01, 2013 for CPGCL | View |
13-08-2012 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (for Gas w.e.f. July 01, 2012) for CPGCL | View |
08-08-2012 | Decision of the Authority relating to the Tariff Adjustment of CPGCL for Variation in CPI w.e.f July 01, 2012 | View |
22-05-2012 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (for the month of April 2012) for CPGCL | View |
14-05-2012 | Decision of the Authority in the Matter of Revision of the Consumer Price Index (CPI) References due to Rebasing by Pakistan Bureau of Statistics for Adjustment of the Escalable Component of Capacity Charge Part of Tariff of Tariff of CPGCL | View |
13-04-2012 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (Applicable w.e.f. 31.03. 2012) for CPGCL | View |
15-03-2012 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of the Capacity Part of Tariff Relating to Tax ( valid for the month of February 2012 only) for CPGCL | View |
27-02-2012 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (Applicable (w.e.f. January 01, 2012) for CPGCL | View |
14-02-2012 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff relating to Fuel (applicable w.e.f. 15.01.2012) for CPGCL | View |
02-01-2012 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (Applicable (w.e.f. December 15, 2011 & December 31, 2011) for CPGCL | View |
29-12-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff relating to Fuel (applicable w.e.f. 30.11.2011) for CPGCL | View |
29-12-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (applicable w.e.f. 15.11.2011) for CPGCL | View |
11-11-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel for CPGCL | View |
19-10-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel for CPGCL | View |
04-10-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel for CPGCL | View |
27-09-2011 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of Tariff Relating to tax (Valid for the month of August 2011only) for CPGCL | View |
19-09-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel for CPGCL | View |
17-08-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. August 15, 2011) for CPGCL | View |
15-08-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. July 31, 2011) for CPGCL | View |
25-07-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. July 15, 2011) for CPGCL | View |
14-07-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. June 30, 2011) for CPGCL | View |
24-06-2011 | Decision of the Authority in the Tariff Adjustment of CPGCL for Variation in CPI w.e.f July 01, 2011 | View |
24-06-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. June 15, 2011) for CPGCL | View |
01-06-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. May 31, 2011) for CPGCL | View |
20-05-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. May 15, 2011) for CPGCL | View |
13-04-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. April 15, 2011) for CPGCL | View |
08-04-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. March 31, 2011) for CPGCL | View |
15-03-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. February 28, 2011) for CPGCL | View |
10-03-2011 | Decision of the Authority with respect to Motion for Leave for Review filed by Central Power Generation Company Ltd. against the Determination dated 26.11.2010 in the matter of 50 MW Rental Power Project, Naudero-II, Sindh | View |
01-03-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. February 15, 2011) for CPGCL | View |
24-01-2011 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of Tariff Relating to Tax (Valid for the Month of January 2011 only) for CPGCL | View |
03-01-2011 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. December 31, 2010) for CPGCL | View |
28-12-2010 | Decision of the Authority relating to the Tariff Adjustment of CPGCL for Variation in CPI w.e.f. January 01, 2011 | View |
15-12-2010 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. November 30, 2010) for CPGCL | View |
13-12-2010 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. 31.10.2010) for CPGCL | View |
26-11-2010 | Determination of the Authority in the Matter of Tariff Petition filed by CPGCL regarding 50MW Rental Power Project. Naudero-II, Sindh | View |
25-10-2010 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Part of Capacity Purchase Price of Tariff Relating to Tax (Valid for the month of October 2010 only) for CPGCL | View |
30-06-2010 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (Valid for the month of April 2010 only) for Central Power Generation Company Ltd (CPGCL) | View |
07-05-2010 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (Valid for the month of April 2010 only) for Central Power Generation Company Ltd (CPGCL) | View |
05-01-2010 | Decision of the Authority relating to the Tariff Adjustment of CPGCL for Variation in CPI on January 01, 2010 | View |
15-12-2009 | Determination of the Authority in the Matter of Petition filed by CPGCL for Approval of Generation Tariff for 110 MW Rental Power Project at Guddu. | |
26-11-2009 | Determination of the Authority in the Matter of Petition filed by CPGCL for Approval of Generation Tariff for 51 MW Rental Power Project at Naudero-I. | |
26-11-2009 | Determination of the Authority in the Matter of Petition filed by CPGCL for Approval of Generation Tariff for 50 MW Rental Power Project at Naudero-II. | |
22-10-2009 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (applicable for the month of October 2009 only) for CPGCL. | |
22-10-2009 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation (on 15.08.2009 & 31.08.2009) | |
05-08-2009 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation w.e.f July 31, 2009. | |
08-05-2009 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation w.e.f April 30, 2009. | |
27-04-2009 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation.` | |
03-04-2009 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation w.e.f February 28, 2009. | |
03-03-2009 | Decision of the Authority in the Matter of Adjustment of Adjustment of the Energy Charge Part of the Tariff Relating to Fuel for CPGCL. | |
23-02-2009 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (applicable for the month of February 2009 only) for CPGCL. | |
23-02-2009 | Decision of the Authority relating to the Tariff Adjustment of CPGCL for variation in CPI on January 01, 2009. |
12-11-2008 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (applicable for the month of October 2008 only) for CPGCL. | |
01-09-2008 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation (on 01.07.2008). | |
15-08-2008 | Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation w.e.f. July 31, 2008. | |
12-08-2008 | Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (Applicable for the month of July 2008 only) for CPGCL | |
27-06-2008 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of Tariff for CPGCL on account of Fuel Price Variation w.e.f May 31, 2008 | |
26-06-2008 | Decision of the Authority relating to the Tariff Adjustment of CPGCL for variation in CPI on July 01, 2008. | |
22-04-2008 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of Tariff for CPGCL on account of Fuel Price Variation w.e.f March 31, 2008 | |
15-04-2008 | Decision of the Authority in the Matter of the Non-Escalable component of capacity part of the tariff relating to tax (applicable for the month of March 2008 only) for CPGCL. | |
07-03-2008 | Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of Tariff for CPGCL on account of Fuel Price Variation (on January 01, 2008). | |
05-03-2008 | Decision of the Authority in the Matter of the Non-Escalable component of capacity part of the tariff relating to tax (applicable for the month of February 2008 only) for CPGCL. | |
15-01-2008 | Decision of the Authority relating to the Tariff Adjustment of CPGCL for Variation in CPI on January 01, 2008 |
27-12-2006 | Decision of the Authority Relating to the Tariff Adjustment of CPGCL for Variation in CPI on January 01, 2006 | |
29-11-2006 | Decision of the Authority in the Matter of Adjustment of the Energy Part of the Tariff Relating to Fuel for CPGCL | |
24-02-2006 | Determination of Tariff of Central Power Generation Company Ltd. (CPGCL) for sale of electricity to the Central Power Purchase Agency within NTDC |
29-03-2004 | Determination of Tariff of Central Power Generation Company Ltd. (CPGCL) for sale of electricity to the Central Power Purchase Agency within NTDC |