National Electric Power Regulatory Authority

Islamic Republic of Pakistan

  • 2025
    25-09-2025
    Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the tariff relating to Gas w.e.f. 1st July 2025 for Central Power Generation Company Limited (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu
    02-09-2025 Notification S.R.O 1713(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated August 08, 2025 along with revised tariff components attached as Annex-I in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for July - September 2025 quarter on account of US CPI, N-CPI and Exchange rate variation
    15-08-2025 Notification S.R.O 1558(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated July 02, 2025 in the matter of Second Tariff Modification Petition filed by Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu
    08-08-2025 Notification S.R.O 1489(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated June 26, 2025 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Advance Income Tax paid to the Federal Board of Revenue
    08-08-2025
    Decision of the Authority in the matter of Quarterly Indexation/Adjustment of tariff for July-September 2025 Quarter for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu
    30-07-2025
    Decision of the Authority in the matter of joint application filed by CPPA-G and Central Power Generation Company Limited for reduction in tariff Components of Guddu 747
    02-07-2025
    Decision of the Authority in the mailer of Second Tariff Modification Petition filed by Central Power Generation Company Limited for its 747 MW CCPP Guddu
    26-06-2025
    Decision of the Authority in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-GUDDU) on account of Advance income Tax paid to the Federal Board of Revenue (FBR)
    29-05-2025 Notification S.R.O 980(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 07., 2025 along with revised tariff components attached as Annex-I in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for the quarter April - June 2025 on account of US CPI, N-CPI and Exchange rate variation
    07-05-2025
    Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for April-June 2025 Quarter for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Proiect at Guddu
    05-05-2025 Notification S.R.O 789(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated March 17., 2025 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue for October - December 2024 quarter of the Tax Year 2025
    28-04-2025 Notification S.R.O 790(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated March 11,2025 in the matter of Tariff Modification Petition filed by Central Power Generation Company Limited for inclusion of open cycle operations on Gas for its Block-I and Block-II
    27-04-2025 Notification S.R.O 512(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated February 12, 2025 along with revised tariff schedule attached as Annex-I regarding adjustment in Insurance Component of Capacity Charge Part of Tariff for the period of August 10,2023 to August 03,2024 in respect of Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu
    17-03-2025
    Decision of the Authority in the matter of Reimbursement request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue (FBK)
    11-03-2025
    Decision of the Authority in the matter of Tariff Modification Petition filed by Central Power Generation Company Limited for inclusion of Open Cycle Operations on gas for its Block-I and Block-lI
    21-02-2025 Notification S.R.O 211(I)/2025 - NEPRA hereby notifies the 'Decision of the Authority dated January 08, 2025 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue'
    18-02-2025 Notification S.R.O 197(I)/2025 - NEPRA hereby notifies the Decision ofthe Authority dated January 24, 2025 along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for the quarter January - March 2025 on account of US CPI, N-CPI and Exchange rate variation
    12-02-2025
    Decision of the Authority in the matter of Adjustment/Indexation in Insurance Component of Capacity Charge Part of tariff for the period of August 10, 2023 to August 03. 2024 for Central Power Generation Company Limited for its 747 MW combined cycle power project at Guddn
    08-01-2025
    Decision of the Authority in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-GUDDU) on account of Advance income Tax paid to the Federal Board of Revenue (FBR)
  • 2024

    06-11-2024

    Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for October-December 2024 Quarter for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu
    18-10-2024 Notification S.R.O 2033(I)/2024 - NEPRA hereby notifies the 'Decision of the Authority dated August 30, 2024 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue
    18-10-2024 Notification S.R.O 2032(I)/2024 - NEPRA hereby notifies the 'Decision of the Authority dated August 30, 2024 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue
    17-10-2024 Notification S.R.O 2035(I)/2024 - NEPRA hereby notifies the 'Decision of the Authority dated August 29, 2024 in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue
    01-10-2024 Notification S.R.O 1625(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated August 16, 2024 in the matter of indexation/adjustment of foreign debt servicing components of tariff for the period ofJuly 1,2024 to December 31,2024 in respect of Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu
    26-08-2024 Notification S.R.O 1366(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated July 31, 2024 along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for the quarter July - September 2024 on account of US CPI, N-CPI and Exchange rate variations

    30-08-2024

    Decision of the Authority in the matter of Reimbursement request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Advance Income Tax paid to the Federal Board of Revenue (FBR)

    30-08-2024

    Decision of the Authority in the matter of Reimbursement request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu on account of Income Tax paid to the Federal Board of Revenue (FBR)

    29-08-2024

    Decision of the Authority in the matter of Reimbursement request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu (CPGCL-Guddu) on account of Income Tax paid to the Federal Board of Revenue (FER)

    16-08-2024

    Decision of the Authority in the matter of Indexation/Adjustment of Foreign Debt Servicing Components of tariff for the Period of July 01, 2024 to December 31, 2024 for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu

    31-07-2024

    Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for July-September 2024 Quarter for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu F
    29-05-2024 Notification S.R.O 854(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated 07th May, 2024 along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for the quarter April - June 2024 on account of US CPI, N-CPI and Exchange rate variations View

    07-05-2024

    Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for April-June 2024 Quarter for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu
    17-04-2024 Notification S.R.O 607(I)/2024 - NEPRA hereby notifies the decision of the Authority dated 29th February, 2024 along with revised tariff components regarding adjustment in Insurance Component of Capacity Charge Part of Tariff on account of Actual Insurance Premium for the period February 11, 2023 to August 09, 2023 in respect of Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu View
    17-04-2024 Notification S.R.O 606(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated 29th February, 2024 along with revised tariff components in the matter of indexation/Adjustment of Foreign Debt Servicing Components of Tariff on account of Exchange Rate and LIBOR variation for the period January 1, 2024 to June 30, 2024 in respect of Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu View
    13-03-2024 Notification S.R.O 394(I)/2024 - NEPRA hereby notifies the decision of the Authority dated 01St February, 2024 in the matter of approval of interim tariff for open cycle operations on gas requested by Central Power Generation Company Limited for its Block-I and block-Il View

    29-02-2024

    Decision of the Authority in the matter of Indexation/Adjustment Foreign Debt Servicing Components of Tariff for the Period of January 01. 2024 to June 30. 2024 for Central Power Generation Company Limited (CPGCL) for 747 MW Combined Cycle Power Project at Guddu

    29-02-2024

    Decision of the Authority in the matter of Adjustment/Indexation in Insurance Component of Capacity Charge Part of Tariff for the Period of February 11, 2023 to August 09, 2023 for Central Power Generation Company Limited for its 747 MW Combined Cycle Power Project at Guddu
    15-02-2024 Notification S.R.O 268(I)/2024 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. for 747 MW Combined Cycle Power Project at Guddu for January - March 2024 quarter on account of US CPI, N-CPI and Exchange rate variations View

    01-02-2024

    Decision of the Authority in the matter of Approval of Interim Tariff for Open Cycle Operations on Gas requested by Central Power Generation Company Limited for Its Block-I and Block-Il. (CPGCL)

    25-01-2024

    Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for January-March 2024 Quarter for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu (
  • 2023
    12-12-2023 Notification S.R.O 1826(I)/2023 - NEPRA hereby notifies the Decision of the Authority in the matter of adjustment in the energy charge part of the tariff relating to Gas w.e.f. 9th February 2016 to 31st December 2022 for Central Power Generation Company Limited View
    30-11-2023 Notification S.R.O 1768(I)/2023 - NEPRA hereby notifies the Decision of the Authority in the matter of Adjustment in the Energy Charge Part of' the Tariff relating to Gas w.e.f 9th February 2016 to 30th June 2022 for Central Power Generation Company Limited (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    14-11-2023 Notification S.R.O 1605(I)/2023 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. for 747 MW Combined Cycle Power Project at Guddu for October - December 2023 quarter on account of US, CPI, N-CPI and Exchange rate variations View
    14-11-2023 Notifiction S.R.O 1604(I)/2023 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. for 747 MW Combined Cycle Power Project at Guddu for October - December 2020 to July to September 2023 quarters on account of N-CPI variation View
    13-11-2023 Decision of the Authority in the matter of Indexation/Adjustment of Foreign Debt Servicing Components of Tariff for the Period of July 01, 2023 to December 31, 2023 for Central Power Generation Company Limited (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    30-10-2023 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 9th February 2016 to 31st December 2022 for Central Power Generation Company Ltd. (CPGCL) View
    24-10-2023 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for October-December 2023 Quarter View
    24-10-2023 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu from October-December 2020 to July-September 2023 Quarters View
    19-10-2023 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f 9th February 2016 to 30th June 2022 for Central Power Generation Company Limited (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    31-08-2023 NOTIFICATION S.R.O 1202(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. for 747 MW Combined Cycle Power Project at Guddu for the quarter July to September 2023 on account of US, CPI, CPI Local and Exchange rate variations View
    09-08-2023 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Limited for 747 MW Combined Cycle Power Project at Guddu for April to June 2023 Ouarter View
    16-06-2023 NOTIFICATION S.R.O 852(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Tariff on account of US, CPI, CPI Local and Exchange rate variation for the period of April to June 2023 in respect of Central Power Generation Company View
    16-06-2023 Decision of the Authority in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Plant at Guddu on account of income Tax paid to the Federal Board of Revenue (FBR) View
    16-06-2023 Decision of the Authority in the matter of Reimbursement Request made by Central Power Generation Company Limited for 747 MW Combined Cycle Power Plant at Guddu on account of income Tax paid to the Federal Board of Revenue (FBR) View
    12-05-2023 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f July to 3Vt December 2022 for Central Power Generation Company Ltd (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
    12-05-2023 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for April to June 2023 Quarter View
    12-05-2023 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st January 2023 for Central Power Generation Company Ltd. (CPGCL) View
    14-04-2023 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1 January 2023 for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
    04-04-2023 NOTIFICATION S.R.O 431(I)/2023-NEPRA hereby notifies the following adjustments in the approved tariff of CPGCL Central Power Generation Company T.imited-747 MW CCPP Schedule of Fuel Cost Part of Energy Charge Adjustment on Account of Fuel Price Variation for Gas View
    04-04-2023 NOTIFICATION S.R.O 427(I)/2023-NEPRA hereby notifies the following adjustments in the approved tariff of CPGCL Central Power Generation Company Limited Schedule of Fuel Cost Part of Energy Charge Adjustment on Account of Fuel Price Variation for Gas View
    04-04-2023 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st July to 31st December 2022 for Central Power Generation Company Ltd. (CPGCL) View
    22-03-2023 NOTIFICATION S.R.O 399(I)/2023- NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustrnent of tariff for the quarter January-March 2023 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd. View
    15-03-2023 Decision of the Authority in the matter of Indexation/Adjustment of Foreign Debt Servicing Component of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for the period of January 1,2023 to June 30, 2023 View
    17-02-2023 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for January-March 2023 Quarter View
  • 2022
    29-12-2022 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas we.f. Pt January to 30th June 2022 for Central Power Generation Company Ltd. (CPGCL) View
    29-12-2022 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st January to 30th  June 2022 for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
    01-11-2022 NOTIFICATION S.R.O. 1968(I)/2022 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff on account of Exchange Rate and LIBOR variation for the period 1st July 2022 to 31st December 2022 in respect of Central Power Generation Company Ltd. View
    28-10-2022 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for October-December 2022 Quarter View
    29-08-2022 NOTIFICATION S.R.O. 1689(I)/2022-NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter January - March 2022 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd View
    29-08-2022 NOTIFICATION S.R.O. 1658(I)/2022-NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter April - June 2022 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd View
    25-08-2022 Decision of the Authority in the matter of Indexation/ Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    27-07-2022 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for July-September 2022 Quarter View
    20-07-2022 S.R.O. 1220(1)/2022- NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff on account of Exchange Rate and LIBOR variation for the period lstJuly 2021 to 31St December 2021 in respect of Central Power Generation Company Ltd View
    20-07-2022 S.R.O. 1213(1)/2022- NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff on account of Exchange Rate and LIBOR variation for the period Pt January 2022 to 30th June 2022 in respect of Central Power Generation Company Ltd. View
    09-06-2022 S.R.O. 1041(1)/2022- NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter October-December 2021 on account of US CPI, CPI Local and Exchange Rate variation and revised components for 28th December-31St December 2020, January - March 2021, April-June 2021 and July-September 2021 quarters in respect of Central Power Generation Company Ltd View
    08-06-2022 S.R.O. 934(1)/2022- NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter April-June 2021 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd. View
    08-06-2022 S.R.O.864(1)/2022-, NEPRA hereby notifies the decision of the Authority along with revised tariff components in the matter of quarterly indexation/adjustment of tariff for the quarter July-September 2021 on account of US CPI, CPI Local and Exchange Rate variation in respect of Central Power Generation Company Ltd. View
    27-05-2022 S.R.O.745(1)/2022-NEPRA hereby notifies the Decision of the Authority in the matter of Motion for Leave for Review filed by Central Power Generation Company Ltd. (CPGCL) against Determination of the Authority dated December 28, 2020 in the matter of Open Cycle Operations and Reduction in ROE of Guddu 747 MW Power Plant View
    22-04-2022 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu for April-June 2022 Quarter View
    24-02-2022 Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    21-01-2022 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
  • 2021
    03-11-2021 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    26-08-2021 Decision of the Authority In the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    02-08-2021 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    28-07-2021 Decision of the Authority in the matter of Motion for Leave for Review filed by Central Power Generation Company Ltd. (CPGCL) against Determination of the Authority dated December 28, 2020 in the matter of Open Cycle Operations and Reduction in ROE of Guddu 747 MW Power Plant View
    27-04-2021 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    01-03-2021 Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    18-02-2021 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    12-01-2021 Determination of the Authority in the matter of Tariff Modification Petition filed by Central Power Generation Company Ltd. (CPGCL) for Modification/Revision of Tariff Determination dated 24th February 2006 View
  • 2020
    29-12-2020 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st September, 2020 for Central Power Generation Company Ltd. (CPGCL) View
    28-12-2020 Determination of the Authority in the matter of Tariff Modification Petition filed by Central Power Generation Company Ltd. (CPGCL) to include Open Cycle Tariff for the 747 MW Combined Cycle Power Project at Guddu in CPGCL's Notified Tariff View
    11-12-2020 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
    11-12-2020 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    16-10-2020 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
    16-10-2020 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Gas w.e.f. 1st August, 2020 for Central Power Generation Company Ltd. (CPGCL) View
    01-10-2020 Order of the authority in the matter of Review Petition filed by Central Power Generation Company Limited against the decision of the Authority dated July 10, 2019. View
    03-09-2020 Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    27-07-2020 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    07-07-2020 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2020 View
    28-04-2020 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    14-02-2020
    Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu
    11-02-2020
    Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu
    16-01-2020
    Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2020
  • 2019
    01-11-2019 Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    18-09-2019 Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    29-08-2019 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL)  View
    29-08-2019 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu  View
    20-08-2019 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu  View
    11-07-2019 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2019 View
    30-05-2019 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    14-03-2019 Decision of the Authority in the matter of Indexation/Adjustment of Debt Servicing Components of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    07-02-2019 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) View
    06-02-2019 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
    23-01-2019 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    08-01-2019 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2019 View
    03-01-2019 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) View
    02-01-2019 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
  • 2018
    23-10-2018 Decision of the Authority in the matter of Reimbursement of Custom Duty and Taxes as Pass Through for Central Power Generation Company Ltd. (CPGCL) for its 747 MW Combined Cycle Power Plant View
    19-10-2018 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    10-09-2018 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
    10-09-2018 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) View
    07-08-2018 Decision of the Authority in the matter of Indexation/Adjustment of Tariff for Central Power Generation Company Ltd. (CPGCL) for 747 MW Combined Cycle Power Project at Guddu View
    29-06-2018 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2018 View
    02-03-2018 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu View
    02-03-2018 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) View
    07-02-2018 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2018 View
  • 2017
    10-07-2017 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2017
    07-04-2017 Decision of the Authority in the matter of Motion for Leave for Review filed by Central Power Generation Company Ltd. (CPGCL) against Authority's Tariff Determination dated April 26, 2016 for 747 MW Power Plant located at Guddu
    25-01-2017 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu
    25-01-2017 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL)
  • 2016
    29-12-2016 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2017
    09-11-2016 Decision of the Authority in the matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) of 747 MW Combined Cycle Power Project (CCPP) at Guddu
    10-08-2016 Corrigendum - Determination of the Authority in the matter of Tariff Petition filed by Central Power Generation Company Ltd. (CPGCL) for Determination of Generation Tariff for 747 MW Combined Cycle Power Project at Guddu dated 26th April 2016
    15-07-2016 Decision of the Authority relating to the Tariff Adjustment in Escalable Part of Capacity Purchase Price of Central Power Generation Company Ltd. on account of CPI Variation w.e.f. July 01, 2016
    25-05-2016 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of the Tariff relating to Fuel for Central Power Generation Company Ltd.
    26-04-2016 Determination of the Authority in the matter of Tariff Petition filed by Central Power Generation Company Ltd. (CPGCL) for Determination of Generation Tariff for 747 MW Combined Cycle Power Project at Guddu
    01-01-2016 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2016
    01-01-2016 Decision of the Authority in the matter of Application for Interim Tariff filed by Central Power Generation Company Ltd. (CPGCL) regarding Approval/Determination of Generation Tariff for 747 MW Combined Cycle Power Plant at Gaddu
  • 2015
    02-10-2015 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel for Central Power Generation Company Ltd. (CPGCL) View
    09-07-2015 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2015 View
    04-02-2015 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2015 View
  • 2014
    10-07-2014 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. July 01, 2014   View
    01-01-2014 Decision of the Authority in the Matter of Tariff Adjustment of Central Power Generation Company Ltd. for Variation in CPI w.e.f. January 01, 2014 View
  • 2013
    26-07-2013 Decision of the Authority relating to the Tariff Adjustment of Central Power Generation Company Ltd. (CPGCL) for Variation in CPI w.e.f. July 1, 2013 (Case No. NEPRA/TRF-44/CPGCL-2005) — Intimation of Decision of Tariff pursuant to Section 31(4) of the Regulation of Generation, Transmission and
    Distribution of Electric Power Act LXL of 1997)
    View
    04-04-2013 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (for Gas w.e.f. January 01, 2013) for CPGCL View
    21-01-2013 Decision of the Authority relating to the Tariff Adjustment for Variation in CPI w.e.f. January 01, 2013 for CPGCL View
  • 2012
    13-08-2012 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (for Gas w.e.f. July 01, 2012) for CPGCL View
    08-08-2012 Decision of the Authority relating to the Tariff Adjustment of CPGCL for Variation in CPI w.e.f July 01, 2012 View
    22-05-2012  Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (for the month of April 2012) for CPGCL View
    14-05-2012 Decision of the Authority in the Matter of Revision of the Consumer Price Index (CPI) References due to Rebasing by Pakistan Bureau of Statistics for Adjustment of the Escalable Component of Capacity Charge Part of Tariff of Tariff of CPGCL View
    13-04-2012 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (Applicable w.e.f. 31.03. 2012) for CPGCL View
    15-03-2012 Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of the Capacity Part of Tariff Relating to Tax ( valid for the month of February 2012 only) for CPGCL View
    27-02-2012 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (Applicable (w.e.f. January 01, 2012) for CPGCL View
    14-02-2012 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff relating to Fuel (applicable w.e.f. 15.01.2012) for CPGCL View
    02-01-2012 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of Tariff relating to Fuel (Applicable (w.e.f. December 15, 2011 & December 31, 2011) for CPGCL View
  • 2011
    29-12-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff relating to Fuel (applicable w.e.f. 30.11.2011)  for CPGCL View
    29-12-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (applicable w.e.f. 15.11.2011) for CPGCL View
    11-11-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel for CPGCL View
    19-10-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel  for CPGCL View
    04-10-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel for CPGCL View
    27-09-2011 Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of Tariff Relating to tax (Valid for the month of August 2011only) for CPGCL View
    19-09-2011  Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel for CPGCL View
    17-08-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. August 15, 2011) for CPGCL View
    15-08-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. July 31, 2011) for CPGCL View
    25-07-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. July 15, 2011) for CPGCL View
    14-07-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. June 30, 2011) for CPGCL View
    24-06-2011 Decision of the Authority in the Tariff Adjustment of CPGCL for Variation in CPI w.e.f July 01, 2011 View
    24-06-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. June 15, 2011) for CPGCL View
    01-06-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. May 31, 2011) for CPGCL View
    20-05-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. May 15, 2011) for CPGCL View
    13-04-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. April 15, 2011) for CPGCL View
    08-04-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. March 31, 2011) for CPGCL View
    15-03-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. February 28, 2011) for CPGCL View
    10-03-2011 Decision of the Authority with respect to Motion for Leave for Review filed by Central Power Generation Company Ltd. against the Determination dated 26.11.2010 in the matter of 50 MW Rental Power Project, Naudero-II, Sindh View
    01-03-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. February 15, 2011) for CPGCL View
    24-01-2011 Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of Tariff Relating to Tax (Valid for the Month of January 2011 only) for CPGCL View
    03-01-2011 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. December 31, 2010) for CPGCL View
  • 2010
    28-12-2010 Decision of the Authority relating to the Tariff Adjustment of CPGCL for Variation in CPI w.e.f. January 01, 2011 View
    15-12-2010 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. November 30, 2010) for CPGCL View
    13-12-2010 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for relating to Fuel (w.e.f. 31.10.2010) for CPGCL View
    26-11-2010 Determination of the Authority in the Matter of Tariff Petition filed by CPGCL regarding 50MW Rental Power Project. Naudero-II, Sindh View
    25-10-2010 Decision of the Authority in the Matter of Adjustment of the Non-Escalable Part of Capacity Purchase Price of Tariff Relating to Tax (Valid for the month of October 2010 only) for CPGCL View
    30-06-2010 Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (Valid for the month of April 2010 only) for Central Power Generation Company Ltd (CPGCL) View  
    07-05-2010 Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (Valid for the month of April 2010 only) for Central Power Generation Company Ltd (CPGCL) View
    05-01-2010 Decision of the Authority relating to the Tariff Adjustment of CPGCL for Variation in CPI on January 01, 2010 View
  • 2009
    15-12-2009 Determination of the Authority in the Matter of Petition filed by CPGCL for Approval of Generation Tariff for 110 MW Rental Power Project at Guddu.
    26-11-2009 Determination of the Authority in the Matter of Petition filed by CPGCL for Approval of Generation Tariff for 51 MW Rental Power Project at Naudero-I.
    26-11-2009 Determination of the Authority in the Matter of Petition filed by CPGCL for Approval of Generation Tariff for 50 MW Rental Power Project at Naudero-II.
    22-10-2009 Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (applicable for the month of October 2009 only) for CPGCL.
    22-10-2009 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation (on 15.08.2009 & 31.08.2009)
    05-08-2009 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation w.e.f July 31, 2009.
    08-05-2009 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation w.e.f April 30, 2009.
    27-04-2009 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation.`
    03-04-2009 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation w.e.f February 28, 2009.
    03-03-2009 Decision of the Authority in the Matter of Adjustment of Adjustment of the Energy Charge Part of the Tariff Relating to Fuel for CPGCL.
    23-02-2009  Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (applicable for the month of February 2009 only) for CPGCL.
    23-02-2009   Decision of the Authority relating to the Tariff Adjustment of CPGCL for variation in CPI on January 01, 2009.
  • 2008
    12-11-2008 Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (applicable for the month of October 2008 only) for CPGCL.
    01-09-2008 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation (on 01.07.2008).
    15-08-2008 Decision of the Authority in the Matter of Adjustment of the Energy Charge Part of the Tariff for CPGCL on account of Fuel Price Variation w.e.f. July 31, 2008.
    12-08-2008  Decision of the Authority in the Matter of Adjustment of the Non-Escalable Component of Capacity Part of the Tariff Relating to Tax (Applicable for the month of July 2008 only) for CPGCL
    27-06-2008 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of Tariff for CPGCL on account of Fuel Price Variation w.e.f May 31, 2008
    26-06-2008 Decision of the Authority relating to the Tariff Adjustment of CPGCL for variation in CPI on July 01, 2008.
    22-04-2008  Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of Tariff for CPGCL on account of Fuel Price Variation w.e.f March 31, 2008
    15-04-2008 Decision of the Authority in the Matter of the Non-Escalable component of capacity part of the tariff relating to tax (applicable for the month of March 2008 only) for CPGCL.
    07-03-2008 Decision of the Authority in the Matter of Adjustment in the Energy Charge Part of Tariff for CPGCL on account of Fuel Price Variation (on January 01, 2008).
    05-03-2008 Decision of the Authority in the Matter of the Non-Escalable component of capacity part of the tariff relating to tax (applicable for the month of February 2008 only) for CPGCL.
    15-01-2008 Decision of the Authority relating to the Tariff Adjustment of CPGCL for Variation in CPI on January 01, 2008
  • 2007
    27-03-2007 Decision of the Authority in the Matter of Adjustment of the Energy Part of the Tariff Relating to Fuel for CPGCL
    07-03-2007 Decision of the Authority in the Matter of Adjustment of the Energy Part of the Tariff Relating to Fuel for CPGCL
  • 2006
    27-12-2006 Decision of the Authority Relating to the Tariff Adjustment of CPGCL for Variation in CPI on January 01, 2006
    29-11-2006 Decision of the Authority in the Matter of Adjustment of the Energy Part of the Tariff Relating to Fuel for CPGCL
    24-02-2006 Determination of Tariff of Central Power Generation Company Ltd. (CPGCL) for sale of electricity to the Central Power Purchase Agency within NTDC
  • 2004
    29-03-2004 Determination of Tariff of Central Power Generation Company Ltd. (CPGCL) for sale of electricity to the Central Power Purchase Agency within NTDC